TECHNICAL INFORMATION
General
Information Section (PDF) — From 25th Edition Ryan Herco Product
Guide
Cement Usage for PVC & CPVC — For estimating solvent cement
needs
Fitting Socket & Thread Depths
Flange Dimension Data — Socket,
thread, and blind flange dimensional information
Flanged Operating Pressures — Maximum
operating pressures for flanged systems
Friction Loss in Schedule 80 Systems — Friction
loss tables for Schedule 80 fittings and pipe
Nipple Dimensions — Lengths
for "Close" and "Short" nipples
Operating Pressures — Maximum
operating pressures for pipe & fittings at 75°F
Solvent Cementing Schedule 80 — Solvent
cementing guidelines for Schedule 80 systems, including equipment, procedure,
set and cure times
Support Spacing for PVC — Recommended
support spacing for Schedule 40 and Schedule 80 PVC
Temperature Correction Factors — Temperature
Correction Factors for PVC, CPVC, Polypropylene and PVDF
Tygon Working Pressures — How
to calculate working pressures for Tygon tubing
|